Jubilant-Cadista Pharmaceuticals Rooftop Unit (RTU) Replacement Project was a two-year project that began in 2020 and consisted of demolition of existing RTUs, Make-up Air Units (MAUs), dust collection system, equipment pads, and installation of new HVAC equipment and associated ductwork both outside, and inside, and around FDA maintained and inspected areas. The greatest challenge of this project was that the majority of the interior work had to be performed during periods of manufacturing shut-downs. It was essential that the project be completed, tested, and turned over by the end of the December 2022 major shut-down, due to the re-start of the client’s manufacturing operations. Had the project not completed on time, the owner stood to lose hundreds of thousands of dollars in revenue, and possibly contracts as well.

  • Contract Type: Stipulated Sum
  • Project Size: 15,732 square feet
  • Project Duration: 3.3 years

I have had the pleasure of working directly with Willow Construction on a number of projects ranging in complexity from small room renovations up through multi-million dollar HVAC projects that entail structural steel work.

Willow Construction has repeatedly proven themselves a trusted, competent GC with their attention to detail, quality of work, and focus on completing projects on time. Their ability to resolve inevitable issues that come up on occasion has been tested at our site, and their response time and commitment to resolving them in a timely manner are noteworthy.

I am happy to recommend Willow Construction as a competent General Contractor with proper staff, expertise, and resource pool to address all of your project management needs in a timely manner with a focus on delivering quality work.

— Joe N. Fairfield, Project Engineer